We use cookies in order to guarantee the best possible service. If you continue browsing the site you consent to our cookie use.

ETS-5407 GTEM! Test Cell

Post Production

For all Phases of EMC Testing - Design Qualification - Pre-Compliance - Full Compliance IEC 61000-4-3 ANSI C63.4

Product Number:

ETS-5407

Manufacturer:

ETS-Lindgren

Quantity:

Total
Unit price
base price
Stock
Call or email for delivery time

Beginning with design qualification testing and moving through to pre-compliance testing, full compliance testing and production sampling, ETS-Lindgren GTEM!™ Test Cell is a time saving device for your test lab. A typical radiated emissions test (10,000 point scan) can be completed in 15 minutes or less, while a typical radiated immunity test can usually be completed in half the normal time.

The GTEM!™ Test Cell is based on experience, not experimentation. Originally developed in the EMC Baden (Switzerland) labs of ABB, the cell has been accepted in the EMC community for more than 10 years, and is field proven daily at more than 400 installations worldwide. Measurements made with a GTEM!™ Test Cell are accepted for final compliance demonstration by the FCC for Part 15 & 18 radiated emissions testing, and comply with IEC 61000-4-3 Annex D for immunity testing. The GTEM!™s unique tapered shape, offset septum, resistive termination network and absorber- lined back wall remove performance limitations of TEM cells and boxy enclosures. Electromagnetic wave and RF current termination are smooth and controlled. Field uniformity is +/- 3 dB up to 1 GHz, and +/-4 dB above 1 GHz.'

Description
Additional Informations
Reviews
Query on the Item
Do you have any questions on this item?
Your E-mail Address
My Question:
Please retype the letters shown here
captcha
Description
Reviews
Query on the Item

Beginning with design qualification testing and moving through to pre-compliance testing, full compliance testing and production sampling, ETS-Lindgren GTEM!™ Test Cell is a time saving device for your test lab. A typical radiated emissions test (10,000 point scan) can be completed in 15 minutes or less, while a typical radiated immunity test can usually be completed in half the normal time.

The GTEM!™ Test Cell is based on experience, not experimentation. Originally developed in the EMC Baden (Switzerland) labs of ABB, the cell has been accepted in the EMC community for more than 10 years, and is field proven daily at more than 400 installations worldwide. Measurements made with a GTEM!™ Test Cell are accepted for final compliance demonstration by the FCC for Part 15 & 18 radiated emissions testing, and comply with IEC 61000-4-3 Annex D for immunity testing. The GTEM!™s unique tapered shape, offset septum, resistive termination network and absorber- lined back wall remove performance limitations of TEM cells and boxy enclosures. Electromagnetic wave and RF current termination are smooth and controlled. Field uniformity is +/- 3 dB up to 1 GHz, and +/-4 dB above 1 GHz.'

Do you have any questions on this item?
Your E-mail Address
My Question:
Please retype the letters shown here
captcha